Call (256) 343-5192
Church Steeples & Roofing

The parts of your
church nobody
can reach.

Steeple People takes care of everything above your ceiling — steeples and roofs. Cleaning, patching, repair, coatings, restoration, and full roof replacement. We work at height so your congregation never has to.

  • Steeples: cleaning, painting, repair, restoration
  • Roofs: cleaning, patching, repair, full replacement
  • One-time service or a 5-year maintenance plan
  • Free assessment — no cost, no obligation
Free Steeple Assessment

Call and we'll take a look

(256) 343-5192
No forms. No sales visit. Just a phone call.

What happens when you call

  1. 1We ask a few questions about the steeple or the roof — height, material, and what you're seeing from the ground.
  2. 2We schedule an on-site look at a time that works around your service schedule.
  3. 3You get photos from up close and a written scope with pricing. Then you decide.
Call now

Monday – Saturday · 7:00 AM – 6:00 PM

Cleaning and Repairing the South’s Steeples
Fully Insured Steeples & Roofs Churches Only No Scaffolding Damage Photo Documented Free Assessment
40–120 ft Typical working height
Why Steeples Get Neglected

It's out of reach, so it's out of mind — until it isn't.

A steeple takes more weather than any other part of your building. Sun, wind, driving rain, and algae work on it year-round, and nobody sees the damage from the parking lot until it's already expensive.

By the time you can see staining, chalking paint, or an open seam from the ground, water has usually been getting in for a while. What starts as a wash-and-seal job becomes framing repair, then interior water damage, then a full replacement.

The same goes for the roof. It's the largest surface on the property and it protects everything underneath it, and almost nobody looks at it until there's a stain on the sanctuary ceiling.

We keep churches ahead of that curve on both. Clean it, seal it, look at it every year, and a steeple or a roof lasts decades longer for a fraction of what replacing it costs.

3–5 yrsBetween cleanings
1 yrBetween inspections
$0Cost to get looked at
What We Do

Two halves of the same job: the steeple and the roof.

Most churches call us about one and find out they need something on the other. Since we're already up there, the assessment covers both — and you only pay to have equipment on site once.

Steeple Work

Above the roofline

Roof Work

The biggest surface you own

Six Things to Look For — Steeple

What your steeple looks like from the parking lot, and what it means.

You don't need to be up there to know something's wrong. Stand at the far end of the lot on a bright day and look up. Here's what to notice.

Sign One

Dark streaks running down

Almost always algae and mildew, usually worst on the north face where it stays damp. Cosmetic at first, but the organic growth holds moisture against the surface and shortens the life of the coating underneath.

Sign Two

The white looks gray or yellow

Chalking. The binder in the paint has broken down under UV and the pigment is powdering off. Rub it with your hand and you'll come away with white residue. It means the protective layer is failing.

Sign Three

A visible dark line at a seam

A joint has opened. Water follows gravity down the inside of the steeple from there, and you often won't see the damage until it reaches the ceiling below.

Sign Four — Call Now

Water stains on the interior ceiling

If it's showing up inside, water has been getting in for a while. This is the point where a wash-and-seal job can turn into framing repair, and every season of delay makes it more expensive.

Sign Five — Call Now

The cross looks tilted

A cross that isn't plumb has usually lost anchoring, often after a wind event. It's both a water-intrusion path and a safety issue, and it doesn't correct itself.

Sign Six

Missing or rattling louvers

Louvers let the belfry breathe and keep weather out. When one is gone or loose you've got an open path for rain and birds, and nesting inside a steeple causes its own kind of damage.

Six Things to Look For — Roof

And what the roof is telling you, if anyone's looking.

Roofs fail slowly and then all at once. Every one of these is visible without a ladder — most from the ground, a couple from inside the building.

Sign One

Black streaks down the shingles

Airborne algae, extremely common across the Southeast. It isn't structural damage, but it holds heat and moisture against the shingle and it makes a well-kept building look neglected from the road.

Sign Two

Granules collecting in the gutters

Those granules are the shingle's UV protection. Once they're washing off in quantity, the asphalt underneath is exposed and the clock on that roof is running much faster than the warranty suggests.

Sign Three

Curling, cupping, or missing shingles

Usually age or heat, sometimes wind. A few missing shingles is a repair. Widespread curling across a whole slope generally means the roof is at the end of its service life rather than in need of patching.

Sign Four — Call Now

Stains on the sanctuary ceiling

Water has already made it through the roof, through the deck, and through the insulation. Every week it continues costs more, and interior finishes and framing are far more expensive to fix than the leak that caused them.

Sign Five — Call Now

A dip or sag in the roofline

Sight along the ridge from the end of the parking lot. If it isn't straight, that's decking or structure, not shingles — and it needs looking at before anyone walks on it.

Sign Six

Rust or lifted metal at valleys and flashing

Valleys, chimneys, vents, and the joint where the steeple base meets the roof are where the overwhelming majority of leaks actually start. Almost never in the middle of a clean slope.

How It Works

Four steps, and the first one is free.

01

You Call

Tell us what you're seeing and roughly how tall the steeple is. Five minutes on the phone tells us most of what we need.

02

Free Assessment

We come out, get up close, and photograph the actual condition — not a guess from the ground. No charge, no obligation.

03

Written Scope

You get photos, findings, and a fixed price in writing. Take it to your board. We'll wait for the vote.

04

Scheduled Work

We work around your service calendar and clean up completely. Before-and-after photos when we're done.

Two Ways to Work With Us

Fix it once, or never think about it again.

Option One

One-Time Service

You've got a specific problem — a leak, staining, peeling paint, a visible crack, storm damage. We come out, fix that, and you're done.

  • Free on-site assessment first
  • Written scope and fixed price
  • Before and after photos
  • No contract, no obligation
Call to schedule
Option Two — Most Churches Choose This

5-Year Maintenance Plan

We put your steeple and your roof on a schedule. Annual inspections, scheduled cleanings, and small repairs handled before they turn into big ones — at a budgeted cost your finance committee can plan around.

  • Annual close-up inspection of steeple and roof
  • Scheduled cleanings included
  • Minor repairs caught early
  • Predictable annual cost, locked in
Call about plans
Featured Project

Ninety feet, twenty years, one weekend of work.

A congregation called about staining they'd noticed from the road. From the ground it looked like a cleaning job. Up close, two seams had opened and sealant had failed along the belfry cornice — water had been tracking down inside the tower for at least a couple of seasons.

We washed, re-sealed every joint, replaced two louver sections, and recoated the spire. Total cost came in well under the replacement quote they'd been dreading, and the steeple is now on an annual inspection cycle.

90 ftWorking height
2 daysOn site
0Services missed
“”
Quick Answers

The three questions we get most.

We use aerial lift equipment and rope access methods suited to the height and the site. Neither requires bolting anything to your building or leaving a scaffold up for weeks, and there's no anchor damage to the steeple or roof.
No. We schedule around your service calendar — weekdays, between services, or whenever works. Tell us your schedule when you call and we'll build the work around it.
We come to your building, get close enough to see real condition, photograph the findings, and give you a written scope with pricing. No charge, no obligation. If your steeple is in good shape, we'll say so. See all common questions →
Free Steeple Assessment

Start with a phone call.

Tell us what you're seeing from the ground. We'll tell you what it probably is, what it takes to fix, and whether it can wait.

(256) 343-5192
Monday – Saturday · 7:00 AM – 6:00 PM
Call Steeple People
Steeple Services

Everything a steeple needs, from cross to base.

Cleaning, coating, repair, and inspection — done at height with the right equipment and the right pressure for your steeple's material. Looking for roof work? That's over here.

Cleaning and Repairing the South’s Steeples
BEFORE AFTER
Service One

Steeple Cleaning & Pressure Washing

Most steeples don't need to be replaced. They need to be washed. Years of algae, mildew, oxidation, and highway film make a white steeple read gray from the road — and once you clean it properly, people notice from the parking lot.

We match the method to the material. Fiberglass and aluminum steeples get a low-pressure soft wash with the right detergent; high pressure on the wrong surface strips gelcoat and drives water into seams.

  • Soft-wash and controlled-pressure methods by material
  • Algae, mildew, mold, and oxidation removal
  • Louver, cross, and finial detail cleaning
  • Gutter, flashing, and roofline cleanup while we're up there
  • Before and after photos, every job
Call about cleaning
SUBSTRATE PRIMER UV TOPCOAT COATING SYSTEM
Service Two

Painting & Protective Coatings

Paint on a steeple isn't cosmetic — it's the waterproofing layer. When it chalks, fades, or cracks, the surface underneath starts absorbing moisture, and that's where the real cost begins.

We prep properly, prime what needs priming, and finish with coatings rated for constant sun and wind exposure. Crosses, finials, and weathervanes get refinished separately so the details look right, not just the big surfaces.

  • Full surface prep, sanding, and priming
  • UV-stable, weather-rated topcoats
  • Gelcoat restoration on fiberglass steeples
  • Cross, finial, and weathervane refinishing
  • Sealant and caulk renewal at every seam
Call about coatings
OPEN SEAM LOUVER FLASHING
Service Three

Repairs & Restoration

If water is getting into your steeple, it's getting in somewhere specific — an open seam, a failed sealant joint, a lifted piece of flashing, a cracked panel. Our job is to find it and close it before it reaches framing.

For older steeples we do full restoration: structural evaluation, panel repair or replacement, re-seating a leaning cross, replacing rotted louvers, and re-sealing the whole assembly.

  • Seam, joint, and sealant repair
  • Cracked fiberglass and gelcoat repair
  • Flashing repair and re-flashing at the base
  • Louver repair and replacement
  • Cross and finial re-seating and re-anchoring
  • Storm and wind damage repair
Call about repairs
INSPECTION REPORT
Service Four

Routine Inspections

An inspection is the cheapest thing we do and the one that saves churches the most money. We get up close, photograph every side, and hand you a report that says plainly what's fine, what to watch, and what needs attention this year.

It's written so a building committee can read it and budget from it — not a technical document you have to interpret.

  • Close-up inspection of all four elevations
  • Photo documentation of every finding
  • Plain-language condition report
  • Priority ranking: now, next year, or watch
  • Cost estimates you can put in a budget
Call to schedule an inspection
Know Your Steeple

The material decides the method.

This is the single most important thing to get right, and it's where a general pressure-washing contractor causes damage. A steeple is not a driveway. If you don't know what yours is made of, we'll identify it during the assessment.

Most Common

Fiberglass

The majority of steeples put up since the 1960s. Light, durable, and low-maintenance — right up until the gelcoat surface starts to break down under UV.

  • Low-pressure soft wash only; high pressure strips gelcoat
  • Chalking is the first failure sign, usually on the sun side
  • Cracks tend to appear at stress points and mounting bolts
  • Gelcoat restoration often beats full replacement by a wide margin
Durable but Deceptive

Aluminum

Very long-lived structurally, but the finish and the seams are where trouble starts. Oxidation dulls the surface and sealant at the panel joints has a shorter life than the metal does.

  • Oxidation removal requires the right chemistry, not more pressure
  • Panel seams and fasteners are the usual water entry points
  • Dissimilar-metal corrosion shows up at fixings and flashing
  • Recoating requires proper etch and primer to bond
Historic & Traditional

Wood

Found on older and historic buildings. Beautiful, repairable, and the least forgiving of neglect — because when wood takes on water it doesn't just stain, it rots.

  • Paint is structural protection, not decoration
  • Rot inspection at the base, louvers, and trim is essential
  • Individual members can be replaced without rebuilding
  • Best candidate for an annual inspection cycle
Access & Safety

Getting up there is most of the job.

The reason steeple work costs what it does isn't the washing or the caulking — it's safely reaching a surface forty to a hundred and twenty feet in the air, on a structure that was never designed to be stood on.

We use aerial lift equipment where the site allows and rope access methods where it doesn't. Neither approach requires erecting scaffolding, which means no weeks of staging in your parking lot, no anchor points drilled into your building, and no exposed structure sitting there through a storm.

Everything is insured for work at height, and we'll put a certificate of insurance in your hands before anyone leaves the ground. If your trustees want it on file before they vote, ask when you call and we'll send it over.

We also protect what's underneath. Landscaping gets covered, walkways stay clear, and the site gets left the way we found it. Congregations notice that part more than they expect to.

If a contractor quotes steeple work without going up to look at it first, they're guessing — and you'll find out what they missed after the invoice.
Every Job, Every Time

What's included no matter what we're doing up there.

  • A free on-site assessment before any price is quoted
  • Written scope with a fixed price, not an hourly estimate
  • Certificate of insurance provided before work starts
  • Work scheduled around your service and event calendar
  • Close-up photographs of the condition we found
  • Before and after photo documentation on completion
  • Full protection of landscaping, walkways, and roofing
  • Complete site cleanup the same day we finish
  • A plain-language summary of what we did and what to watch
  • An honest answer if the work doesn't need doing yet
How It Works

Four steps, and the first one is free.

01

You Call

Tell us what you're seeing and roughly how tall the steeple is. Five minutes on the phone tells us most of what we need.

02

Free Assessment

We come out, get up close, and photograph the actual condition — not a guess from the ground. No charge, no obligation.

03

Written Scope

You get photos, findings, and a fixed price in writing. Take it to your board. We'll wait for the vote.

04

Scheduled Work

We work around your service calendar and clean up completely. You get before-and-after photos when we're done.

Free Steeple Assessment

Not sure which service you need?

That's what the assessment is for. Call and describe what you're seeing — we'll tell you honestly whether it's a wash, a repair, or something that can wait a year.

(256) 343-5192
Monday – Saturday · 7:00 AM – 6:00 PM
Call Steeple People
Church Roofing

From a single patch to a whole new roof.

We clean, repair, patch, and replace church roofs — shingle, metal, and low-slope. Same crew, same equipment, same free assessment as the steeple.

Cleaning and Repairing the South’s Steeples
SHINGLEUNDERLAYDECK ROOF ASSEMBLY
Roof Service One

Roof Replacement

When a roof is genuinely at the end of its life, patching it again is throwing money at a problem that's already decided. We'll tell you plainly when you've reached that point — and just as plainly when you haven't.

A replacement means a full tear-off down to the deck so we can see what's actually under there. Soft decking gets replaced, not covered over. Then underlayment, proper flashing at every transition, and the finish material you've chosen.

Layering new shingles over old is cheaper on paper and we don't recommend it on a church. It hides the decking, adds weight to a structure that may be a century old, and cuts the life of the new roof.

  • Complete tear-off and deck inspection
  • Rotted or soft decking replaced before anything goes down
  • Architectural shingle, standing-seam metal, or low-slope membrane
  • New flashing at valleys, chimneys, vents, and the steeple base
  • Ridge and soffit ventilation corrected while the roof is open
  • Complete magnetic nail sweep of the grounds and parking areas
Call about replacement
VALLEYFLASHINGPENETRATION WHERE LEAKS ACTUALLY START
Roof Service Two

Repair & Patching

The hard part of a leak isn't the patch. It's finding it. Water enters at one point and shows up on a ceiling somewhere else entirely, often several feet away and sometimes on a different slope.

Leaks almost never start in the middle of a clean run of shingles. They start at transitions — valleys, chimneys, vents, skylights, the joint where the steeple base meets the roof plane. That's where we look first, and that last one is a joint most roofers handle poorly and we deal with constantly.

If a repair is the right answer, we do the repair and don't try to sell you a roof. If it isn't, we'll show you photographs of why.

  • Leak tracing to the actual entry point, not the visible stain
  • Valley, flashing, vent, and chimney repair
  • Steeple-to-roof transition sealing and re-flashing
  • Shingle replacement and colour matching
  • Ridge cap and gutter repair
  • Emergency tarping after storm damage
Call about a leak
ALGAE STREAKING SOFT WASHED
Roof Service Three

Roof Cleaning & Soft Washing

Those black streaks running down Southern roofs are algae, and this climate grows it enthusiastically. It won't collapse your roof, but it holds moisture and heat against the shingle, and it makes a maintained building look abandoned from the road.

The critical thing is how it's removed. Pressure washing a shingle roof strips the protective granules off and takes years of life with them. We soft wash — low pressure, correct chemistry, and the algae dies rather than getting blasted away.

Moss on shaded north slopes is a different problem and a more serious one, because moss lifts shingle edges and holds standing water underneath. That gets handled differently, and we'll tell you which one you have.

  • Low-pressure soft wash, never a pressure washer on shingles
  • Algae, moss, lichen, and mildew treatment
  • Landscaping protected and rinsed throughout
  • Gutters cleaned out while we're up there
  • Metal and low-slope roofs washed to their own spec
Call about roof cleaning
1234 ROOF PLAN — INSPECTION POINTS
Roof Service Four

Inspections & Storm Assessments

Most churches find out about a roof problem from a ceiling stain, which means they find out late. An annual inspection moves that discovery two or three years earlier, when it's still a repair.

You get the same kind of report we do for steeples: photographs of every slope and transition, plain-language findings, and a priority ranking your building committee can budget from.

After a hail or wind event we'll come look and tell you honestly whether there's real damage. Sometimes there is and it's worth a claim. Sometimes there isn't, and we'd rather say so than help you spend a deductible for nothing.

  • Every slope, valley, and transition photographed
  • Plain-language report with priority ranking
  • Post-storm damage assessment
  • Documentation you can hand to an insurance adjuster
  • Honest answer on whether a claim is worth filing
Call to schedule an inspection
Know Your Roof

Three kinds of roof, three different conversations.

Most churches have at least two of these on one property — a steep sanctuary roof and something low-slope over an addition. They fail differently and they get treated differently.

Most Common

Asphalt Shingle

What's on the majority of church buildings. Affordable, repairable, widely available in colours that match what's already there.

  • Typical service life of twenty to thirty years in this climate
  • Granule loss is the clearest sign of remaining life
  • Individual slopes can be replaced without doing the whole roof
  • Very responsive to soft washing and routine cleaning
Long-Term

Standing-Seam Metal

Higher up-front cost and much longer life. Increasingly the choice when a congregation is replacing a roof they intend to be the last one they buy.

  • Fifty years or more when installed and flashed correctly
  • Fasteners and seams matter more than the panels do
  • Handles wind and hail better than shingle
  • Pairs well with a metal or aluminium steeple
Often Overlooked

Low-Slope & Flat

Fellowship halls, classroom wings, and additions. This is where most church roof problems actually live, because water sits instead of running off.

  • Membrane systems, coatings, and modified bitumen
  • Ponding water is the primary failure mode
  • Drains and scuppers need clearing, not just the roof
  • Coating systems can extend life substantially and cheaply
Why We Only Do Churches

A church roof isn't a big house roof.

The spans are longer, the pitches are often steeper, and the structure underneath is frequently older than anyone currently on the building committee. Sanctuary ceilings are usually finished in ways that make interior water damage expensive out of all proportion to the leak that caused it.

Then there's the steeple sitting in the middle of the roof plane. That joint is a leak point on a large share of the churches we look at, and it gets handled badly by roofers who see one a year. We see them constantly, and we can address the steeple and the flashing around it in the same visit rather than sending you to two contractors who each blame the other.

The scheduling is different too. You can't close a church for a week. Work has to fit around Sunday, Wednesday, funerals, weddings, and whatever the calendar holds — and the building has to be safe and usable in between.

And the money works differently. Decisions go through a board, get voted on, and have to hold up against a budget. That means a real written number, not a range, and a scope that can be phased if it needs to be spread across two budget years.

If your steeple and your roof are handled by two different contractors, the joint between them belongs to neither of them. That's usually exactly where the water is getting in.
After a Storm

Hail, wind, and what to do in the first week.

We work across a stretch of the Southeast that takes real weather. Here's the order of operations we'd recommend to any church that just came through something.

01

Stop the Water

If there's active intrusion, tarping comes first. Call us and we'll get something over it before anything else gets decided.

02

Document It

Photographs from up close, dated, before anything is touched or cleaned up. This is what an adjuster will want and what churches most often fail to get.

03

Get an Honest Read

We'll tell you whether the damage is real and claim-worthy or cosmetic. Not every dented vent cap is a new roof, and we won't pretend otherwise.

04

Then Decide

With photographs and a written scope in hand, you can file a claim, repair it directly, or wait — as an informed decision rather than a guess.

Every Roof Job

What's included whatever we're doing up there.

  • A free on-site assessment before any price is quoted
  • Written scope with a fixed price, not an hourly estimate
  • Certificate of insurance provided before work starts
  • Work scheduled around your service and event calendar
  • The steeple and its flashing looked at in the same visit
  • Close-up photographs of the condition we found
  • Landscaping, walkways, and windows protected
  • Magnetic nail sweep of grounds and parking
  • Full debris removal and same-day site cleanup
  • An honest answer if the roof doesn't need replacing yet
Roofing Questions

What churches ask us before they call back.

That's exactly what the free assessment answers, and it's the question we get asked most. Broadly: isolated damage at transitions is a repair, while widespread granule loss, curling across whole slopes, or decking that's gone soft usually means replacement. We'll show you photographs either way so you're deciding from evidence rather than from our opinion.
Yes, and it's a normal part of how we plan a job. A replacement is a multi-day project, so we sequence it slope by slope and make sure the building is dried in and safe before every service. Tell us your calendar — Sundays, Wednesdays, funerals, weddings, preschool hours — and we'll build the schedule around it.
Yes, and you should ask for that. Getting equipment on site is a real share of what any height work costs, so doing both at once is cheaper than two separate visits. It also means the steeple-to-roof flashing gets addressed by one crew instead of falling between two contractors.
We document damage thoroughly and give you photographs and a written scope you can hand directly to an adjuster. We're not public adjusters and we won't file on your behalf, but the documentation is what most claims turn on. We'll also tell you honestly when we don't think a claim is worth filing.
It depends on how long the congregation plans to be in the building and how the budget works. Metal costs meaningfully more up front and lasts roughly twice as long, so over thirty years it usually comes out ahead. But if capital is tight and shingle gets you twenty-five good years, that's a perfectly sound decision and we'll say so.
Sometimes. If the building has distinct sections — sanctuary, fellowship hall, classroom wing — those can often be done in separate years, worst first. What we won't do is split a single roof plane across two seasons, because the seam between old and new becomes the next leak.
Most run somewhere between a few days and a couple of weeks depending on size, pitch, complexity, and how much decking needs replacing once we open it up. You'll get a schedule in writing with the price, and we'll tell you as soon as anything changes it.
Free Roof Assessment

Get up there before the ceiling tells you.

Whether it's a stain, a storm, or nobody's looked in fifteen years — the assessment is free and the answer might be that you're fine.

(256) 343-5192
Monday – Saturday · 7:00 AM – 6:00 PM
Call Steeple People
Maintenance Plans

One job, or five years of not worrying.

Every church is different. Some need one job done well. Others want the steeple and the roof on a schedule so neither one ever becomes an emergency line item again.

Cleaning and Repairing the South’s Steeples
Choose Your Approach

Pricing depends on height, material, and condition — so it starts with a free look.

We don't publish flat rates, because a 40-foot aluminum steeple and a 90-foot fiberglass one aren't the same job, and neither are a shingle sanctuary roof and a low-slope fellowship hall. Call and we'll get you a real number in writing.

Option One

One-Time Service

Quoted per job
After a free on-site assessment

For a specific, visible problem you want solved now. Clean it, seal it, repair it, done.

  • Free assessment and written quote
  • Cleaning, painting, or repair as needed
  • Before and after photo documentation
  • Full cleanup, work scheduled around services
  • No contract or ongoing commitment
Call for a quote
Most Chosen
Option Two

5-Year Maintenance Plan

Fixed annual cost
Locked in for the full five years

Your steeple and roof go on a schedule. We inspect both every year, clean on cycle, and handle small repairs before they grow — for a number your treasurer can budget.

  • Annual close-up inspection of steeple and roof
  • Scheduled cleanings included in the plan
  • Minor sealant and seam repairs included
  • Priority scheduling after storms
  • Written condition history year over year
  • Rate locked for five years
Call about the plan
Option Three

Restoration Project

Scoped & quoted
For steeples that have been waiting a while

For a steeple with real deterioration — water intrusion, structural concerns, failed panels, or decades of deferred maintenance.

  • Full condition evaluation and report
  • Panel, seam, and structural repair
  • Complete recoating system
  • Cross and finial restoration
  • Phased scope if you need to spread the cost
Call to discuss
The Case for a Plan

Deferred maintenance doesn't stay the same price.

A steeple that gets washed and sealed on schedule costs roughly the same every few years. A steeple that gets ignored doesn't — it gets quietly worse until the repair is structural, and then the number jumps.

Churches don't usually defer steeple work because they don't care. They defer it because it's invisible, hard to price, and easy to push to next year's budget. A plan takes that decision off the table.

Call and we'll walk you through what a five-year plan would actually look like for your building.

YEAR 1 YEAR 5 YEAR 10 COST
On a maintenance plan Deferred until it's urgent
Year by Year

What five years on a plan actually looks like.

This is a typical shape. Your steeple's condition at the first inspection determines where the cleanings land and what gets addressed in which year — we'll map it out with you before anything is signed.

Year One

Baseline inspection of steeple and roof

We start with a complete close-up inspection — all four steeple elevations plus every roof slope, valley, and transition — and establish the baseline photo record. Then the steeple gets a full wash, the roof gets treated if it needs it, and any sealant that's already failing gets renewed. This is the year that tells us everything about the next four.

Year Two

Inspection and spot repair

Annual inspection with side-by-side comparison against last year's photos. Small things — a joint starting to open, a loose louver, sealant pulling at a corner — get handled while they're still small. That comparison is where the value of a plan really shows up.

Year Three

Inspection and mid-cycle wash

Depending on tree cover and how fast growth returns, most steeples want another wash around here. Inspection happens either way, and we update the written condition history you can hand to whoever's on the building committee next.

Year Four

Inspection and coating assessment

By year four we can tell you with real confidence how much life is left in the current coating system — not a guess, but a judgment based on four years of your steeple's own photographs. If a recoat is coming, this is when you start budgeting for it rather than reacting to it.

Year Five

Inspection, cleaning, and a five-year report

Final year of the term includes a full wash and a summary report covering the whole period: what changed, what we addressed, and what the next five years should look like. Most churches renew at this point, and they renew knowing exactly what they're buying.

Side by Side

Which one fits your church.

One-Time Service5-Year PlanRestoration
Best forA specific visible problemKeeping a sound building soundYears of deferred maintenance
Free assessmentYesYesYes
InspectionsOne, at the assessmentSteeple and roof, every yearFull condition evaluation
CleaningsOneScheduled through the termIncluded in project scope
Minor repairsQuoted separatelySealant and seam work includedCentral to the scope
Cost patternOne line item, one yearFixed annual amount, lockedProject cost, phaseable
Storm responseStandard schedulingPriority scheduling and tarpingStandard scheduling
Written historyJob photosYear-over-year recordFull project documentation
CommitmentNoneFive-year termPer project or per phase
For Trustees & Finance Committees

Built to survive a budget meeting.

Steeple work loses budget votes for a predictable reason: nobody can say what it costs, so it gets pushed to next year against something with a firm number attached. Then it gets pushed again.

Everything we give you is designed to survive that meeting. The assessment comes back as photographs, a written scope, and a fixed price — not a range, not an estimate that moves. You can put it in front of a board and get a yes or a no on the first pass.

The five-year plan exists for the same reason. A fixed annual amount goes into the operating budget once and stays there. It doesn't compete for capital dollars every year, and it doesn't need re-arguing when the committee turns over.

And the year-over-year photo record means whoever inherits the building file two chairpersons from now can see exactly what's been done and what's coming. That continuity is worth more than most churches expect it to be.

The most expensive steeple repair is always the one that got deferred three times because nobody had a number.
Plan Questions

Before you bring it to the board.

Yes, and a lot of churches do exactly that. Get the immediate problem fixed, see how we work, then decide about the plan. There's no penalty for taking it in that order and we don't price it against you for waiting.
Minor repairs — sealant, seams, small hardware — are included. Anything larger gets quoted separately, in writing, with photographs, before any work happens. You're never surprised by an invoice. And because we're inspecting annually, major repairs during a plan term are far less common than they are on a neglected steeple.
No. The annual amount is fixed for the full term when the plan starts. That's the point of it — your treasurer puts one number in the budget and it stays that number.
Yes. Multiple steeples, a bell tower and a spire, a sanctuary plus a fellowship hall roof, or a main campus plus a chapel can all go under one plan and one annual number. Mention it when you call so we can assess everything in the same visit.
Often, yes. We'll scope it in phases and tell you honestly which phase has to happen first — usually anything stopping active water intrusion — and which can safely wait a year. What we won't do is split a scope in a way that costs you more overall just to make one year's number look better.
Free Steeple Assessment

Get a real number for your steeple.

One call, one free visit, and a written price your board can vote on. There's nothing to sign to find out.

(256) 343-5192
Monday – Saturday · 7:00 AM – 6:00 PM
Call Steeple People
Our Work

Work we've brought back.

Steeples and roofs, different heights and different materials. The common thread is that every one of them looked worse from up close than it did from the parking lot.

Cleaning and Repairing the South’s Steeples
Roofing
Full tear-off and new architectural shingle across the sanctuary and both wings.
Replacement
Sanctuary Roof Replacement
Roofing
Leak traced to a failed valley two slopes away from where the ceiling was staining.
Leak Repair
Valley & Flashing Repair
Roofing
Twenty years of black algae streaking soft washed off without touching a granule.
Soft Wash
Shingle Roof Cleaning
Painting
Chalked south face stripped, primed, and recoated to match the original white.
Full Recoat
Sun-Faded Aluminum Steeple
Restoration
Rotted wood louvers rebuilt and the belfry re-sealed on a century-old building.
Wood Repair
Historic Belfry Louvers
Cleaning
Small-church spire washed and sealed in a single morning, done before noon.
Soft Wash
42-ft Country Church Spire
Cleaning
Twelve years of algae removed in a single day — no coating damage.
Soft Wash
62-ft Fiberglass Spire
Painting
Full recoat plus gold-leaf refinish on the cross and finial ball.
Coating System
Octagonal Belfry Steeple
Repair
Open vertical seam sealed before it reached the framing below.
Seam & Sealant
Brick Tower & Spire
Restoration
Tiered historic steeple rebuilt in phases across two budget years.
Phased Project
Two-Tier Historic Steeple
Cleaning
Heavy north-face streaking cleared; gutters and flashing cleaned the same visit.
Soft Wash
Narrow Colonial Spire
Repair
Wind-shifted cross re-anchored and re-plumbed after a spring storm.
Storm Damage
Cross Re-Anchoring
Featured Project

Ninety feet, twenty years, one weekend of work.

A congregation called about staining they'd noticed from the road. From the ground it looked like a cleaning job. Up close, two seams had opened and sealant had failed along the belfry cornice — water had been tracking down inside the tower for at least a couple of seasons.

We washed, re-sealed every joint, replaced two louver sections, and recoated the spire. Total cost came in well under the replacement quote they'd been dreading, and the steeple is now on an annual inspection cycle.

90 ftWorking height
2 daysOn site
0Services missed
Second Project

They had a quote to replace it. They didn't need one.

A church had been told their fiberglass steeple was past saving and quoted for a full replacement, including a crane day. Before committing that kind of money they wanted a second opinion.

What we found was chalked gelcoat, heavy algae on the north face, and failed sealant at four joints — significant, but entirely repairable. The structure underneath was sound. We restored the gelcoat, re-sealed everything, recoated the spire, and refinished the cross.

The steeple came out looking new. The congregation kept the difference, and put part of it toward a five-year plan so the question never comes up again.

0Panels replaced
4Joints re-sealed
1Crane day avoided
40–120 ftTypical working height
1–3 daysMost steeple jobs, start to finish
0Services we've made a church miss
$0Cost of the assessment
What Churches Say

The work speaks, but so do the people who hired us.

“They worked around our Sunday and Wednesday schedule without us having to ask twice. The steeple looks like it did the year it went up.”
“The photo report was worth the call by itself. We finally had something concrete to take to the trustees instead of a guess.”
“We were told we needed a whole new steeple. They cleaned and repaired it for a fraction of that and told us honestly what to watch.”
Free Steeple Assessment

Yours could be next.

Most steeples that look like they need replacing don't. Call and let us tell you which one yours is.

(256) 343-5192
Monday – Saturday · 7:00 AM – 6:00 PM
Call Steeple People
Contact

One number. A real person.

No forms to fill out and no waiting for an email back. Call and talk to someone who works on steeples for a living.

Cleaning and Repairing the South’s Steeples

Call us about your steeple or your roof.

Whether you've noticed something specific or you just realized nobody has been up on the building in fifteen years, the first conversation is free and takes about five minutes.

  • Phone (256) 343-5192
  • Hours Monday – Saturday
    7:00 AM – 6:00 PM
  • Home Base 1196 Amason Rd
    Lineville, AL 36266
  • Serving A wide radius across the Southeast — north through Tennessee into Kentucky, east to the Carolinas, southeast toward Savannah, south to the Florida Panhandle, and west through central Mississippi.
  • Steeples Cleaning, painting and coatings, repair and restoration, and routine inspections.
  • Roofs Cleaning and soft washing, repair and patching, full replacement, and annual or post-storm inspections.
  • Insurance Fully insured. Certificate available on request before any work begins.
Free Steeple Assessment

Ready when you are

Tap or dial. If we're up on a roof, leave a message and we'll call back the same day.

(256) 343-5192
Mon – Sat · 7:00 AM – 6:00 PM
Call now

Helpful to have handy

  • Whether it's the steeple, the roof, or both
  • Roughly how tall the steeple is, if that's the concern
  • What it's made of, if you know — fiberglass, aluminum, wood, shingle, or metal
  • What you're seeing: staining, streaking, peeling, cracks, or a leak inside
  • When it was last cleaned, painted, or roofed — even a rough guess
  • Your town, so we can tell you right away that we cover it
  • Your service schedule, so we can plan around it
KENTUCKY TENNESSEE THE CAROLINAS SAVANNAH, GA FLORIDA PANHANDLE CENTRAL MISSISSIPPI LINEVILLE, AL — HOME BASE
Service Area

We come to you, and we come a long way.

Home base is Lineville, Alabama, in Clay County. Church work is worth traveling for, so our radius is a good deal wider than most contractors'. If you're near the edge of it, call anyway — the answer is usually yes.

North & Northwest

Tennessee & Kentucky

Straight up through Alabama into Tennessee and on into Kentucky. Regular territory for us, not an exception we make.

  • All of Alabama, corner to corner
  • Across Tennessee
  • Into Kentucky
East & Southeast

Georgia & the Carolinas

East across Georgia to South Carolina, up to where North Carolina meets the South Carolina line, and southeast down toward Savannah.

  • All of Georgia, including the Savannah area
  • South Carolina
  • Southern and western North Carolina
South & West

Florida Panhandle & Mississippi

South to the Panhandle and west into Mississippi, out to roughly the middle of the state before we turn back toward Alabama.

  • The Florida Panhandle
  • Eastern and central Mississippi
  • Not sure if you're inside it? Just ask
When to Call

How urgent is it, honestly?

We'd rather you called early than late, but we're not going to tell you everything is an emergency. Here's roughly how we triage what people describe on the phone.

Call This Week

Water is getting in

Interior stains, a visible drip, a cross that's out of plumb, or obvious storm damage. These get worse on their own and the repair scope grows every season you wait.

  • Water stains on ceilings or interior walls
  • Leaning, loose, or shifted cross
  • Visible gaps at seams or missing roof panels
  • A dip or sag anywhere along the roofline
  • Anything that changed after a storm
Call This Season

The surface is failing

Not an emergency, but the protective layer is going. Handled now it's a cleaning and coating job; handled in three years it may not be.

  • Chalking, fading, or peeling paint
  • Heavy algae streaking on the steeple or roof
  • Granules collecting in the gutters
  • Rattling or missing louvers, curling shingles
  • Sealant visibly cracked or pulling away
Call When Convenient

Nobody's looked in years

Nothing visibly wrong, but no one can remember the last time anyone was up there. This is the ideal time to get a baseline — the assessment is free and it may well come back clean.

  • No steeple or roof inspection in the last five years
  • New building committee wanting a baseline
  • Planning a capital campaign or renovation
  • Budgeting for the coming year
Who We Work With

Churches of every size, denomination, and steeple.

Small Congregations

A single spire, one roof, and a tight budget. We'll tell you the minimum that actually needs doing this year and what can honestly wait.

Established Churches

Multi-tier steeples, bell towers, sanctuary roofs, and fellowship hall additions. Usually the best fit for a five-year plan with fixed annual cost.

Historic Buildings

Older construction where the goal is preservation, not replacement. Phased scopes so the work fits across budget years.

Common Questions

Answered before you call.

We use aerial lift equipment and rope access methods suited to the height and the site. Neither requires bolting anything to your building or leaving a scaffold up for weeks, and there's no anchor damage to the steeple or roof.
No. We schedule around your service calendar — weekdays, between services, or whenever works. Tell us your schedule when you call and we'll build the work around it.
Most steeples benefit from a wash every three to five years, depending on tree cover, humidity, and which direction the weather comes from. Inspections should happen more often than that — annually is ideal, since catching an open seam early is what keeps a cleaning job from becoming a repair job.
We come to your building, get close enough to see real condition, photograph the findings, and give you a written scope with pricing. There's no charge and no obligation to proceed. If your steeple is in good shape, we'll say so.
Yes, fully insured for work at height. We'll provide a certificate of insurance to your church before any work starts — just ask when you call.
All three, plus mixed construction. The material changes the method significantly — fiberglass needs low pressure and gelcoat-safe products, aluminum has different seam and oxidation issues, and wood has its own rot and moisture concerns. Tell us what you have and we'll tell you what's involved.
Usually, yes. Visible interior water means it's been getting in for a while, and the longer it continues the more likely you're dealing with framing rather than surface repair. Call and describe what you're seeing — we'll tell you honestly how quickly it needs attention.
Most cleaning jobs are a single day. Cleaning plus sealant and coating work usually runs two to three. Restoration projects depend entirely on scope, and we'll give you a schedule in writing along with the price so you can plan around it.
Coatings need dry conditions and safe wind speeds, so weather does move dates occasionally. We'll tell you as soon as we know rather than showing up and standing around, and we won't rush a coating onto a damp surface to stay on schedule — that's how a job fails in two years instead of lasting fifteen.
Yes. Bell towers, roof-mounted crosses, cupolas, and other high work on church buildings are all within what we do. If it's high up, on a church, and nobody wants to climb it, call and describe it.
Then we tell you that and you owe us nothing. It happens, and we'd rather you called us again in three years than felt talked into work you didn't need. If we do recommend something, we'll also tell you plainly what could wait.
Free Steeple Assessment

Give us five minutes.

Describe what you're seeing. We'll tell you what it likely is and what it takes to fix — before you spend anything.

(256) 343-5192
Monday – Saturday · 7:00 AM – 6:00 PM
Call Steeple People